HS2 Construction Site Fuel System

Project information

Location: HS2 Construction Site, near Lichfield

Contractor: OTS Group

Project Completion: September 2023

Geberit Know-How

Challenge: A reliable pipework system was needed to dispense Diesel and AdBlue

Solution: Geberit Mapress stainless steel allowed for a tailored fuel distribution, ensuring a substantial supply of up to 500 litres per minute through the pipework to accommodate the needs of large vehicles and machinery on the site

Project overview
Why Geberit?
Delivering the solution

Project overview

Premier fuel storage solution providers, OTS Group, supplied two storage tanks to meet the demand for a robust fuel system for heavy-duty machinery at the HS2 construction site near Lichfield, Staffordshire.

A pipework system was needed to dispense diesel and AdBlue, a solution designed to help diesel vehicles meet the latest Euro 6 exhaust emission regulations, from the storage tanks to fuel construction transport on-site, such as cranes, machinery and lorries. OTS Group needed to find a reliable partner to supply quality pipework to connect the fuel storage tanks to the dispensers.

Why Geberit?

Collaborating with Geberit, OTS Group used Geberit Mapress at the high-speed railway construction site. The press-fit piping system's adaptability in different sizes and diameters allowed for a tailored fuel distribution, ensuring a substantial supply of up to 500 litres per minute through the pipework to accommodate the needs of large vehicles and machinery on the site.

The use of stainless steel components and a diverse range of fittings facilitated a compact, durable and reliable installation. Using a press-fit system ensured a secure maintenance-free network, eliminating the fuel leak risks that are associated with traditional threaded systems.

Delivering the solution

Geberit Mapress provided a reliable system from the fuel storage tanks to the fuel dispensers which helped day-to-day work on-site run efficiently for the HS2 construction workers. Both OTS Group and HS2 were happy with the final result, and praised the uniform nature, clean bends and appearance of the installation.

Neil Betteridge, Project Director at OTS Group, said:

“The Geberit Mapress installation process delivered a leak-free, dependable solution, with a sleek design that not only enhanced aesthetics but made for an efficient pipework system.“

“With a 25-year guarantee*, Mapress stands out for its longevity, robustness and low-maintenance approach. It sets the bar for efficient and reliable pipework in fuel distribution systems.“